← Free tools

BidsScores

The 20-Point Bid Review Checklist

What I check before recommending any contractor bid. — Joshua Aponte, founder of BidsScores

Scope — is the whole job in there?

  • Every damaged area from the loss is addressed, not just the obvious ones
  • Tear-off / demolition of damaged materials is listed
  • Debris disposal & haul-off (dumpster, dump fees) is priced
  • Detach & reset of fixtures, cabinets, and HVAC in the way
  • Drying / water mitigation is included on water losses
  • Paint of adjacent surfaces so the repair doesn't look patched

Pricing — can you actually compare it?

  • Firm unit pricing and quantities — not lump sums or allowances
  • No 'TBD', 'by others', or 'as needed' hiding future cost
  • The total is in a believable range vs. the other bids (not suspiciously low)
  • For insurance work: bid compared line-by-line to the carrier estimate

Exclusions — what's being pushed back to you?

  • Permits & inspections are included (not excluded to your account)
  • Code-required upgrades are priced (ice-and-water shield, GFCI, egress)
  • Containment & dust protection for occupied units
  • Daily cleanup and final cleaning are covered

The contractor — can they finish it?

  • Active license, liability insurance, and workers-comp verified
  • Written workmanship and materials warranty
  • A realistic timeline / schedule in writing
  • References or past jobs of similar size and type

Before you award

  • You're comparing on normalized cost — what each bid would cost at full scope — not the headline price
  • The recommendation is documented so it survives a board or ownership review

Want this done for you automatically?

Upload your bids at BidsScores.com and get a per-line score, the true cost, and a board-ready recommendation — free.

Upload your bids free
The 20-Point Bid Review Checklist (free, printable) | BidsScores | BidsScores